BUNNINGS 728 – 750 PRINCESS HIGHWAY, TEMPE, AUSTRALIA

Project Description: BUNNINGS 728 – 750 PRINCESS HIGHWAY, TEMPE, AUSTRALIA

  • Crushing Over 10,000 tones of concrete
  • 425 foundation piles
  • 11,000 cubic meters of cut and fill material
  • Removal of contaminated soil
  • 12,000 square meters of asphalting
  • Concrete driveways to the curbs and gutters
© 2023 Australian Construction Group